Gatwick airport travel chaos as trains from London cancelled over next three Sundays
Extra coach services will be laid on as main line to Brighton is closed
Your support helps us to tell the story
From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.
At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.
The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.
Your support makes all the difference.Gatwick airport will be cut off from London by rail for the next three Sundays.
Engineering work is taking place on 25 February, 4 March and 11 March to replace a key junction at Earlswood, where the fast and slow lines to the airport converge. It is part of a £300m track modernisation programme.
Services will end late on Saturday night and re-start at around 4am on Monday morning.
David Bennett, Gatwick’s surface transport operations manager, said: “Passengers planning to travel to or from Gatwick Airport by train during any of the next three Sundays should plan their journey carefully and allow extra time.”
On the affected days, trains to and from London will start and terminate at Redhill, six miles north of Gatwick, with a bus connection to the airport. Overall journey times are likely to increase by at least half-an-hour.
National Express is planning extra coach services during the rail blockade.
The London-Brighton main line, on which Gatwick is situated, is undergoing a major overhaul. Work will take place between Gatwick and Three Bridges, the station south of the airport, over the May bank holiday weekend.
In the next 12 months, the line from Three Bridges to Brighton will be completely closed for 18 days, from 20-28 October and 16-24 February 2019, for work to repair tunnels on the line.
From May this year, new direct Thameslink services will start from Gatwick to both Cambridge and Peterborough for the first time.
Elsewhere, engineering work over Easter will lead to disruption. London Euston station will be closed completely all day on Easter Sunday, 1 April, cutting links to Birmingham, Manchester and Glasgow.
Work over Easter at London Paddington will disrupt West of England and South Wales services on GWR, and reduce the frequency on the Heathrow Express and Heathrow Connect services.
Join our commenting forum
Join thought-provoking conversations, follow other Independent readers and see their replies
Comments