Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

London’s landmark Tower Bridge undergoes overnight maintenance works

About 40,000 people and 21,000 vehicles a day cross Tower Bridge.

John Besley
Thursday 12 October 2023 02:22 EDT
Engineers work at Tower Bridge in central London (James Manning/PA)
Engineers work at Tower Bridge in central London (James Manning/PA) (PA Wire)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Overnight work is being carried out to replace some giant components of London’s landmark Tower Bridge.

Four two metre-long nose bolts have been removed and replaced for the first time in decades as part of a series of maintenance works taking place during overnight closures.

The bolts lock in place the moving parts of the bridge, known as bascules, when it is lowered to allow traffic and pedestrians to cross the 129-year-old structure.

The work is being carried out by City Bridge Foundation, the 900-year-old charity which owns and maintains Tower Bridge and four other Thames crossings.

Paul Monaghan, assistant director of engineering for City Bridge Foundation, said: “As well as being London’s defining landmark, Tower Bridge is a key part of the capital’s transport infrastructure.

“As a bridge with moving parts, it’s inevitable that we will see wear and tear, but carrying out planned work like this avoids the need for more disruptive and costly repairs further down the line.

“Doing these kind of jobs at night means we keep London moving and minimise disruption to motorists, pedestrians and the many tourists who come to enjoy the visitor attraction.”

Around 40,000 people and 21,000 vehicles a day cross the bridge, which lifts around 900 times a year to let boats pass underneath.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in