Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

London’s landmark Tower Bridge undergoes overnight maintenance works

About 40,000 people and 21,000 vehicles a day cross Tower Bridge.

John Besley
Thursday 12 October 2023 02:22 EDT
Engineers work at Tower Bridge in central London (James Manning/PA)
Engineers work at Tower Bridge in central London (James Manning/PA) (PA Wire)

Your support helps us to tell the story

As your White House correspondent, I ask the tough questions and seek the answers that matter.

Your support enables me to be in the room, pressing for transparency and accountability. Without your contributions, we wouldn't have the resources to challenge those in power.

Your donation makes it possible for us to keep doing this important work, keeping you informed every step of the way to the November election

Head shot of Andrew Feinberg

Andrew Feinberg

White House Correspondent

Overnight work is being carried out to replace some giant components of London’s landmark Tower Bridge.

Four two metre-long nose bolts have been removed and replaced for the first time in decades as part of a series of maintenance works taking place during overnight closures.

The bolts lock in place the moving parts of the bridge, known as bascules, when it is lowered to allow traffic and pedestrians to cross the 129-year-old structure.

The work is being carried out by City Bridge Foundation, the 900-year-old charity which owns and maintains Tower Bridge and four other Thames crossings.

Paul Monaghan, assistant director of engineering for City Bridge Foundation, said: “As well as being London’s defining landmark, Tower Bridge is a key part of the capital’s transport infrastructure.

“As a bridge with moving parts, it’s inevitable that we will see wear and tear, but carrying out planned work like this avoids the need for more disruptive and costly repairs further down the line.

“Doing these kind of jobs at night means we keep London moving and minimise disruption to motorists, pedestrians and the many tourists who come to enjoy the visitor attraction.”

Around 40,000 people and 21,000 vehicles a day cross the bridge, which lifts around 900 times a year to let boats pass underneath.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in