Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Bangladesh marks opening of country's longest bridge

Bangladesh’s Prime Minister Sheikh Hasina has celebrated the opening of the country’s longest bridge, which took eight years to build amid setbacks involving political conflict and corruption allegations

Via AP news wire
Saturday 25 June 2022 05:18 EDT

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Bangladesh’s Prime Minister Sheikh Hasina on Saturday celebrated the opening of the country’s longest bridge, which took eight years to build amid setbacks involving political conflict and corruption allegations.

The 6.51-kilometer (4.04-mile) bridge spanning the Padma River cost an estimated $3.6 billion and was paid for with domestic funds after the World Bank and other global lending agencies declined to finance the project following a graft scandal involving a Canadian construction company.

The bridge, which will open to the public on Sunday, will slash the distance between the capital, Dhaka, and Bangladesh’s second largest seaport, Mongla, by 100 kilometers (62 miles).

“The bridge belongs to the people of Bangladesh. It encapsulates our passion, creativity, courage, endurance and perseverance,” Hasina said at a ceremony in Mawa, about 31 kilometers (19 miles) southwest of Dhaka.

While not directly part of China’s Belt and Road infrastructure initiative, the bridge was built by the China Major Bridge Engineering Company Ltd. and is seen by Beijing as a milestone for cooperation with Bangladesh, according to a statement by China’s Ambassador Li Jiming.

The China Railway Group has said the Padma Bridge will later feature a rail network that connects with other Belt and Road projects and will serve as an important link between China and a pan-Asian rail network.

Economists say the Padma Bridge will increase Bangladesh’s gross domestic product by an additional 1.3% per year, adding to robust growth projections from the Asian Development Bank that predict Bangladesh’s $465 billion economy will grow by 6.9% in 2021-22, and 7.1% in 2022-23.

Officials said the bridge will connect at least 21 districts in the southern and southwestern regions of Bangladesh.

Experts say the construction of the bridge, which involved more than 4,000 engineers, was a major technical challenge. The underwater pilings extend 122 meters (400 feet) deep, a world record, and it requires 41 pillars. At some points in the river, the water flow volume ranks second globally only after the Amazon River.

The World Bank said in 2012 that it found elements of corruption involving a Canadian construction firm in the plans for the Padma Bridge and decided to stay away from funding $1.2 billion for the project.

The decision prompted other lending agencies including the Asian Development Bank, Japan International Cooperation Agency and Islamic Development Bank to distance themselves from the project. Hasina then said Bangladesh would build the bridge with its own funds.

The corruption charges went to a Superior Court in Ontario, Canada, which acquitted three former top executives of SNC-Lavalin, the Canadian firm, in an international bribery case linked to the bridge's construction in 2017.

Hasina also defied bitter criticism by political opposition led by former Prime Minister Khaleda Zia during the construction of the bridge. The opposition criticized Hasina's government for increasing the budget threefold over the years and accused the authorities of corruption. Hasina rejected the allegations.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in