Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

California Highway 1 to reopen by April 30, agency says

The California Department of Transportation says Highway 1 along Big Sur is expected to reopen by April 30 because work to repair a huge piece of roadway that crumbled during a winter storm is nearly two months ahead of schedule

Via AP news wire
Thursday 08 April 2021 18:01 EDT
Big Sur-Highway Reopens
Big Sur-Highway Reopens

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Highway 1 along Big Sur is expected to reopen by April 30 because work to repair a huge piece of roadway that crumbled during a storm is nearly two months ahead of schedule, the California Department of Transportation announced Thursday.

The scenic highway snaking through California's rugged coastal cliffs has been closed since Jan. 28, when heavy rain triggered a landslide that carried a chunk of roadway into the sea. The washout left a 150-foot (46-meter) gap along the picturesque driving route.

Crews began to fill the canyon below with compacted dirt in early March. They are expected to establish the base of a new road on top of the fill, then pave and stripe it by the end of the month thanks to favorable weather conditions, Caltrans said.

“Reopening Highway 1 at Rat Creek just three months after a washout of this magnitude is great news for residents, recreationalists, business owners, and those who move goods through this region,” Caltrans Director Toks Omishakin said in a statement. “Caltrans has been focused on the emergency work needed to increase the resiliency of this highway section to extreme weather, and the fixes made will allow for safe travel.”

After reopening, crews will replace the main drainage system above the fixed roadway to help withstand future debris flows, rising sea levels and coastal erosion, Caltrans said. They will also work on landscaping and installing guardrails throughout the early summer.

The work was estimated to cost $11.5 million, the agency said.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in