Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Channel station plans on wrong track, BR told

Christian Wolmar
Saturday 27 February 1993 19:02 EST
Comments

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

A FEROCIOUS row has broken out between British Rail and the Department of Transport over plans for the London terminus of the proposed Channel tunnel rail link.

The department has angrily thrown back a report submitted by the British Rail board on the two main options for the London station, a low-level structure at King's Cross or a refurbished St Pancras.

The board, fearful of legal action from the London Regeneration Consortium that is the proposed developer of the 134-site north of King's Cross, wants to stick with the low-level option.

Union Railways, the BR subsidiary that will build the link to the Channel tunnel, prefers the St Pancras option, because it reckons it would cost about half the pounds 1.4bn of the low-level station.

Department of Transport officials believe that BR's report does not provide sufficient information on the St Pancras option and also implies that the cost difference between the two proposals is quite small.

This has angered John Prideaux, the chairman of Union Railways, who has fought hard for the St Pancras scheme. He is convinced that this option would be much cheaper, even though it would involve moving two listed gasometers to the north of the site.

Under the scheme, the main line to Sheffield would be moved to King's Cross, and St Pancras would have two platforms for Network SouthEast's Thameslink services. The low- level terminus option would also handle Thameslink.

BR argues that changing the plans could result in further delay. However, Dr Prideaux reckons that even BR's favoured low-level terminal at King's Cross is likely to take longer to build than the link itself, which could be completed by the end of 1999.

Transport ministers, anxious to publish the suggested line of the rail link to Folkestone before the county council elections on May 6 may be forced to issue the plans for the Kent section separately.

(Photograph omitted)

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in