Stay up to date with notifications from The Independent

Notifications can be managed in browser preferences.

Another section of overturned shipwreck separated

Demolition crews have finished cutting away the sixth of eight sections of a giant cargo ship that tipped over off the Georgia coast nearly two years ago, leaving just one more cut before the dwindling remains are completely removed

Via AP news wire
Saturday 31 July 2021 13:43 EDT
Overturned Cargo Ship Georgia
Overturned Cargo Ship Georgia (Copyright 2021 The Associated Press. All rights reserved.)

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

Demolition crews have finished cutting away the sixth of eight sections of a giant cargo ship that tipped over off the Georgia coast nearly two years ago, leaving just one more cut before the dwindling remains are completely removed.

Separation of the section occurred late Friday, said Michael Himes, a spokesman for the U.S. Coast Guard Unified Command. Sometime Saturday, a pilot will steer the sixth section away from the rest of the Golden Ray’s half-submerged wreckage in waters between St. Simons and Jekyll islands, The Brunswick News reported.

The 3,695-metric-ton (4,073 U.S. tons) mass of steel is hanging suspended by tension wire from the arching rafters of the 255-foot-tall (85-yard-tall) VB 10,000. The VB 10,000 and its load sit inside the 1-mile-perimeter environmental protection barrier that surrounds the salvage site.

The Golden Ray, carrying more than 1,400 vehicles, overturned after leaving the Port of Brunswick along the Georgia coast on Sept. 8, 2019. Harbor pilot Jonathan Tennant and about two dozen crew members on board were rescued and survived.

The removal of Section 6 will leave about 153.5 feet of shipwreck still in the St. Simons Sound. Section 6 is bound for a dismantling site on the East River in Brunswick, where it will join the 3,640-ton Section 3. Each of the four remaining sections will be cut up into about a dozen smaller pieces at the location, loaded onto a barge and transported to the Modern American Recycling Services facility in Gibson, Louisiana

Maritime engineers suspect these four middle sections suffered the brunt of any structural damage when the Golden Ray overturned on its port side Sept. 8, 2019, while heading out to sea with its cargo. The four outer sections were all transported via barge whole and directly to the MARS facility on the Louisiana Gulf Coast.

Cutting to remove Section 6 started July 22.

The Unified Command advises mariners to steer clear of the perimeter safety zone, which has been increased from 150 yards to 200 yards.

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in