Top 10 Renovation Tips

Saturday 28 November 1998 19:02 EST
Comments

Your support helps us to tell the story

From reproductive rights to climate change to Big Tech, The Independent is on the ground when the story is developing. Whether it's investigating the financials of Elon Musk's pro-Trump PAC or producing our latest documentary, 'The A Word', which shines a light on the American women fighting for reproductive rights, we know how important it is to parse out the facts from the messaging.

At such a critical moment in US history, we need reporters on the ground. Your donation allows us to keep sending journalists to speak to both sides of the story.

The Independent is trusted by Americans across the entire political spectrum. And unlike many other quality news outlets, we choose not to lock Americans out of our reporting and analysis with paywalls. We believe quality journalism should be available to everyone, paid for by those who can afford it.

Your support makes all the difference.

1 Appraise the state of the property, by breaking it down into structural parts as a builder would. What condition are the following in?

l Walls, plastering, repointing etc.

l Roof - does it need reroofing?

l Floors - what are the joists like and how much flooring is needed?

l Electrics - does it need a new circuit board, rewiring?

l Plumbing, heating and hot water

l Windows

This goes some way to breaking down the costs into a more tangible set of figures. Tasks can then be prioritised.

2 Keep a contingency fund (10-15 per cent of your budget) for unexpected extras as you expose more of the property - walls falling down, a bit of rot.

3 Many structural surveys mention damp and infestation. Don't panic - and don't line the pockets of "specialists". Apart from the guarantee, most jobbing builders will provide the equivalent at a fraction of the cost. Most houses have

some damp and a bit of rot and unless it is dry rot and rife, it can be tolerated.

4 Most builders are hopelessly optimistic when estimating time.

5 More and more local authorities are releasing their dilapidated properties for sale. If you are financially organised it is possible to beat off builders at auction by bidding over their profit margin.

6 You have to enjoy "camping" - unless you can afford to live elsewhere whilst the work is going you will have to sacrifice creature comforts. We had no bath or hot water for three months.

7 Do not proceed with your partner unless you are pretty sure your relationship can take it. It will be tested.

8 Do not stop the momentum of working. It is very difficult to start again.

9 Before hiring a builder, isolate the parts of jobs - preparation and clearing up for example - that you can do. Labour is far more expensive than materials in most common domestic tasks.

10 Keep the grandparents happy.

Join our commenting forum

Join thought-provoking conversations, follow other Independent readers and see their replies

Comments

Thank you for registering

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in